Showing posts with label Africa. Show all posts
Showing posts with label Africa. Show all posts

Friday, May 14, 2010


Company is putting another project under drill in its J/V with Antofagasta. Results from Daero Paulos drilling are disappointing so far. Asmara project is the most promising asset of the company now and recent development by Nevsun Resources with commissioning of mining equipment for mine in Eritrea will bring some tail wind with the exploration news.



Sunridge Gold Corp. (SGC-TSX-V) is a junior company that has successfully defined four independently estimated 43-101 mineral deposits on the Asmara Project, Eritrea in East Africa. A positive scoping study on the large Emba Derho copper-zinc-gold deposit was completed in June 2009.The four deposits have total indicated 43-101-resources containing:
1.28 billion pounds. of copper,
2.5 billion pounds of zinc,
1.05 million ounces of gold, and
31.2 million ounces of silver Sunridge recently entered into a strategic partnership with Antofagasta Minerals S.A. whereby Antofagasta has agreed to fund US $10,000,000.in exploration work on areas of the Asmara Project and has become the Company's largest shareholder through a US $5.0 million private placement.
Management: Sunridge is managed by an experienced team with a successful track record of discovery and development of precious and base metals projects with companies such as Bema Gold and Nevsun Resources.





Press Release Source: Sunridge Gold Corp. On Wednesday May 12, 2010, 8:30 am EDT
VANCOUVER, BRITISH COLUMBIA--(Marketwire - 05/12/10) - Sunridge Gold Corp. ("Sunridge") (TSX-V:SGC - News) is pleased to announce that Sunridge and Antofagasta Minerals S.A. have commenced a new drilling program at the Adi Rassi copper-gold prospect within the Asmara Project, Eritrea, which is within the Exploration Areas and part of the joint-venture exploration funding agreement with Antofagasta Minerals announced October 2, 2009. The Adi Rassi copper/gold prospect is located about 8 kilometers southeast of the company's Debarwa high-grade copper/gold VMS deposit. The program will consist of at least four holes totaling 1,200 meters of diamond drilling.
The copper and gold mineralization at the Adi Rassi prospect is associated with quartz veins and breccia zones along a major shear zone that trends northeast and dips steeply to the west. This mineralization is mainly hosted in strongly foliated and distorted altered mafic volcanic tuff and flows. Alteration associated with copper mineralization can be seen at surface in a zone that measures about 80 meters wide along a strike length of approximately 500 meters.
From 1971 to 1974 the prospect was evaluated by the Ethio-Nippon Mining Company and a drill program of 11 diamond drill holes comprising 2,170 meters of core were completed over a 550 meters of strike length. The best results from this historic drilling were 41.3 meters of 1.77% Copper (DDH EN-7) and 33.6 meters of 1.5% copper (DDH EN-4).
Note: The above drill results are taken from the report "Adi Rassi Copper Prospect - Ore Resources Evaluation" by D.J. Toogood, December 1997, Phelps Dodge Exploration Corp. While the above historical data appears to be complete and the procedures followed appear reliable, Sunridge has not completed the work necessary to verify the reported results.
DAERO PAULOS DRILLING:
All results have recently been received from the drilling of the large Daero Paulos copper target also part of the Antofagasta joint-venture exploration funding agreement. Twelve widely spaced diamond drill holes were drilled over an area of surface alteration measuring approximately 500 meters wide and 2.5 kilometers long. The program returned only a few narrow zones of mineralization.
REGIONAL TARGET GENERATION
In addition to the above drilling programs a regional target generation program is underway covering all parts of the Exploration Areas as defined in the joint-venture exploration funding agreement with Antofagasta. Stream geochemical sampling, satellite imagery analysis and local geological mapping are the main tools being used and it is hoped that this work will result in the generation of new drill targets over the next few weeks.
ABOUT SUNRIDGE:
Sunridge is a mineral exploration and development company focused on the acquisition, exploration, discovery and development of base and precious metal projects on the Asmara Project in Eritrea and exploration properties in Madagascar.
Sunridge has approximately 76 million shares outstanding and approximately $5.5 million in cash. Sunridge trades on the TSX Venture Exchange under the symbol SGC. For additional information on the Company and its projects please view the slide show on our website at http://www.sunridgegold.com/ or call Don Halliday or Greg Davis at the numbers listed below.
NOTES:
1. A Quality Assurance/Quality Control program was part of the samplingprogram on the Daero Paulos copper prospect. This program includes chainof custody protocols as well as systematic submittals of standards,duplicates and blank samples into the flow of samples produced by thesampling.2. Samples were prepared at African Horn Testing Services (Eritrea) andanalyzed at Genalysis Laboratories (a NATA registered laboratory) inPerth, Western Australia.3. The results of the Daero Paulos copper prospect drill program have beenreviewed by Michael J. Hopley the Qualified Person for Sunridge. Mr.Hopley is also the person responsible for preparation of the technicalinformation contained in this news release and is President and ChiefExecutive Officer of Sunridge.
SUNRIDGE GOLD CORP.
Michael Hopley, President and Chief Executive Officer"


Company is putting another project under drill in its J/V with Antofagasta. Results from Daero Paulos drilling are disappointing so far. Asmara project is the most promising asset of the company now and recent development by Nevsun Resources with commissioning of mining equipment for mine in Eritrea will bring some tail wind with the exploration news.



Sunridge Gold Corp. (SGC-TSX-V) is a junior company that has successfully defined four independently estimated 43-101 mineral deposits on the Asmara Project, Eritrea in East Africa. A positive scoping study on the large Emba Derho copper-zinc-gold deposit was completed in June 2009.The four deposits have total indicated 43-101-resources containing:
1.28 billion pounds. of copper,
2.5 billion pounds of zinc,
1.05 million ounces of gold, and
31.2 million ounces of silver Sunridge recently entered into a strategic partnership with Antofagasta Minerals S.A. whereby Antofagasta has agreed to fund US $10,000,000.in exploration work on areas of the Asmara Project and has become the Company's largest shareholder through a US $5.0 million private placement.
Management: Sunridge is managed by an experienced team with a successful track record of discovery and development of precious and base metals projects with companies such as Bema Gold and Nevsun Resources.





Press Release Source: Sunridge Gold Corp. On Wednesday May 12, 2010, 8:30 am EDT
VANCOUVER, BRITISH COLUMBIA--(Marketwire - 05/12/10) - Sunridge Gold Corp. ("Sunridge") (TSX-V:SGC - News) is pleased to announce that Sunridge and Antofagasta Minerals S.A. have commenced a new drilling program at the Adi Rassi copper-gold prospect within the Asmara Project, Eritrea, which is within the Exploration Areas and part of the joint-venture exploration funding agreement with Antofagasta Minerals announced October 2, 2009. The Adi Rassi copper/gold prospect is located about 8 kilometers southeast of the company's Debarwa high-grade copper/gold VMS deposit. The program will consist of at least four holes totaling 1,200 meters of diamond drilling.
The copper and gold mineralization at the Adi Rassi prospect is associated with quartz veins and breccia zones along a major shear zone that trends northeast and dips steeply to the west. This mineralization is mainly hosted in strongly foliated and distorted altered mafic volcanic tuff and flows. Alteration associated with copper mineralization can be seen at surface in a zone that measures about 80 meters wide along a strike length of approximately 500 meters.
From 1971 to 1974 the prospect was evaluated by the Ethio-Nippon Mining Company and a drill program of 11 diamond drill holes comprising 2,170 meters of core were completed over a 550 meters of strike length. The best results from this historic drilling were 41.3 meters of 1.77% Copper (DDH EN-7) and 33.6 meters of 1.5% copper (DDH EN-4).
Note: The above drill results are taken from the report "Adi Rassi Copper Prospect - Ore Resources Evaluation" by D.J. Toogood, December 1997, Phelps Dodge Exploration Corp. While the above historical data appears to be complete and the procedures followed appear reliable, Sunridge has not completed the work necessary to verify the reported results.
DAERO PAULOS DRILLING:
All results have recently been received from the drilling of the large Daero Paulos copper target also part of the Antofagasta joint-venture exploration funding agreement. Twelve widely spaced diamond drill holes were drilled over an area of surface alteration measuring approximately 500 meters wide and 2.5 kilometers long. The program returned only a few narrow zones of mineralization.
REGIONAL TARGET GENERATION
In addition to the above drilling programs a regional target generation program is underway covering all parts of the Exploration Areas as defined in the joint-venture exploration funding agreement with Antofagasta. Stream geochemical sampling, satellite imagery analysis and local geological mapping are the main tools being used and it is hoped that this work will result in the generation of new drill targets over the next few weeks.
ABOUT SUNRIDGE:
Sunridge is a mineral exploration and development company focused on the acquisition, exploration, discovery and development of base and precious metal projects on the Asmara Project in Eritrea and exploration properties in Madagascar.
Sunridge has approximately 76 million shares outstanding and approximately $5.5 million in cash. Sunridge trades on the TSX Venture Exchange under the symbol SGC. For additional information on the Company and its projects please view the slide show on our website at http://www.sunridgegold.com/ or call Don Halliday or Greg Davis at the numbers listed below.
NOTES:
1. A Quality Assurance/Quality Control program was part of the samplingprogram on the Daero Paulos copper prospect. This program includes chainof custody protocols as well as systematic submittals of standards,duplicates and blank samples into the flow of samples produced by thesampling.2. Samples were prepared at African Horn Testing Services (Eritrea) andanalyzed at Genalysis Laboratories (a NATA registered laboratory) inPerth, Western Australia.3. The results of the Daero Paulos copper prospect drill program have beenreviewed by Michael J. Hopley the Qualified Person for Sunridge. Mr.Hopley is also the person responsible for preparation of the technicalinformation contained in this news release and is President and ChiefExecutive Officer of Sunridge.
SUNRIDGE GOLD CORP.
Michael Hopley, President and Chief Executive Officer"

Monday, May 10, 2010

Wednesday, April 21, 2010

Volta Resources is one of the few Juniors in Gold space which came back stronger after crisis and after merger Birim Goldfields with Goldcrest Resources company performs very well with recent discoveries.

Volta Reports More Wide Mineralized Intercepts in the Next Section of Drilling at its Kiaka Gold Project Including 119.5m (at) 1.15g/t Gold, 108.45m (at) 1.06g/t Gold and 94m (at) 1.21g/t Gold


Press Release Source: Volta Resources Inc. On Wednesday April 21, 2010, 9:06 am
TSX: VTRTORONTO, April 21 /CNW/ - Volta Resources Inc. ("Volta" or the "Company") (TSX: VTR - News) announces the drill results from the next completed section at its Kiaka Gold Project, located approximately 120 kilometres southeast of Ouagadougou, the capital city of Burkina Faso. To date, 88 holes (~13,674 meters) have been completed of the current program comprising more than 110 holes ((greater than)17,400 meters) planned for the Central Area at Kiaka. So far results have been received for 71 holes from this area, with the current news release covering the latest 6 holes, which are all located on Section 5600N (See Figure 1). The highlights from this section include:
- KDH55 : 119.25m (at) 1.15g/t Au, including 56.00m (at) 1.76g/t Au AND


- KDH55 : 39.75m (at) 1.81g/t Au, including 31.10m (at) 2.24g/t Au


- KRD56 : 66.00m (at) 1.16g/t Au, including 34.00m (at) 1.36g/t Au


- KRD57 : 94.00m (at) 1.21g/t Au, including 5.00m (at) 2.26g/t Au and 44.00m (at) 1.50g/t Au AND


- KRD57 : 81.00m (at) 1.02g/t Au, including 11.00m (at) 2.38g/t Au


- KRD58 : 42.00m (at) 0.78g/t Au, including 3.00m (at) 2.51g/t Au and 3.00m (at) 2.79g/t Au - KDH59 : 108.45m (at) 1.06g/t Au, including 45.35m (at) 1.25g/t Au and 18.75m (at) 1.95g/t Au


- KKRC32 : 22.00m (at) 0.67g/t Au, including 5.00m (at) 1.60g/t Au


Kevin Bullock, Volta's CEO, said, "Once again we have encountered widthsat better than expected grades from the KMZ zone. As we near completion of ourfirst drill campaign at Kiaka we can unequivocally state that the results haveconsistently exceeded expectations. We look forward to soon incorporating allof the results into our initial resource estimate, which will support ourplans to aggressively move to the next stage in developing Kiaka to itsultimate potential."
In order to appreciate the extent and geometry of the mineralization on the 5600N section, the results for the intersections for the six Volta holes are highlighted in Table 1 below and on the section in Figure 2. Analyses of the Volta samples were undertaken by fire assay on a 50g charge at ALS Chemex Laboratories in Ouagadougou. Volta's sampling and assay procedures included QA/QC elements that employed the inclusion of certified standards and blanks.



More.


Volta Resources is one of the few Juniors in Gold space which came back stronger after crisis and after merger Birim Goldfields with Goldcrest Resources company performs very well with recent discoveries.

Volta Reports More Wide Mineralized Intercepts in the Next Section of Drilling at its Kiaka Gold Project Including 119.5m (at) 1.15g/t Gold, 108.45m (at) 1.06g/t Gold and 94m (at) 1.21g/t Gold


Press Release Source: Volta Resources Inc. On Wednesday April 21, 2010, 9:06 am
TSX: VTRTORONTO, April 21 /CNW/ - Volta Resources Inc. ("Volta" or the "Company") (TSX: VTR - News) announces the drill results from the next completed section at its Kiaka Gold Project, located approximately 120 kilometres southeast of Ouagadougou, the capital city of Burkina Faso. To date, 88 holes (~13,674 meters) have been completed of the current program comprising more than 110 holes ((greater than)17,400 meters) planned for the Central Area at Kiaka. So far results have been received for 71 holes from this area, with the current news release covering the latest 6 holes, which are all located on Section 5600N (See Figure 1). The highlights from this section include:
- KDH55 : 119.25m (at) 1.15g/t Au, including 56.00m (at) 1.76g/t Au AND


- KDH55 : 39.75m (at) 1.81g/t Au, including 31.10m (at) 2.24g/t Au


- KRD56 : 66.00m (at) 1.16g/t Au, including 34.00m (at) 1.36g/t Au


- KRD57 : 94.00m (at) 1.21g/t Au, including 5.00m (at) 2.26g/t Au and 44.00m (at) 1.50g/t Au AND


- KRD57 : 81.00m (at) 1.02g/t Au, including 11.00m (at) 2.38g/t Au


- KRD58 : 42.00m (at) 0.78g/t Au, including 3.00m (at) 2.51g/t Au and 3.00m (at) 2.79g/t Au - KDH59 : 108.45m (at) 1.06g/t Au, including 45.35m (at) 1.25g/t Au and 18.75m (at) 1.95g/t Au


- KKRC32 : 22.00m (at) 0.67g/t Au, including 5.00m (at) 1.60g/t Au


Kevin Bullock, Volta's CEO, said, "Once again we have encountered widthsat better than expected grades from the KMZ zone. As we near completion of ourfirst drill campaign at Kiaka we can unequivocally state that the results haveconsistently exceeded expectations. We look forward to soon incorporating allof the results into our initial resource estimate, which will support ourplans to aggressively move to the next stage in developing Kiaka to itsultimate potential."
In order to appreciate the extent and geometry of the mineralization on the 5600N section, the results for the intersections for the six Volta holes are highlighted in Table 1 below and on the section in Figure 2. Analyses of the Volta samples were undertaken by fire assay on a 50g charge at ALS Chemex Laboratories in Ouagadougou. Volta's sampling and assay procedures included QA/QC elements that employed the inclusion of certified standards and blanks.



More.


Thursday, February 25, 2010


Stock now is building the base still under fear over UN sanctions.

"Nevsun Resources Ltd. ("Nevsun") is pleased to advise that it has arranged a non-brokered private placement financing of 52,000,000 common shares at Cdn $2.25 per share for Cdn$117 million (US$110 million).

It is a very encouraging news for Eritrea - after UN sanctions all Juniors involved in the counter were under pressure. In a long perspective it will be very positive development for Sunridge Gold SGC.v and new parent company of former Sanu Resources SNU.v - Lukas Lunding global exploration play NGeX Resources NGQ.to which is now trading below recent financing, when Lukas Lundin has increased his holding in the company."




"Sunridge Gold Corp. (SGC-TSX-V) is a junior company that has successfully defined four independently estimated 43-101 mineral deposits on the Asmara Project, Eritrea in East Africa. A positive scoping study on the large Emba Derho copper-zinc-gold deposit was completed in June 2009.The four deposits have total indicated 43-101-resources containing:
1.28 billion pounds. of copper,
2.5 billion pounds of zinc,
1.05 million ounces of gold, and
31.2 million ounces of silver Sunridge recently entered into a strategic partnership with Antofagasta Minerals S.A. whereby Antofagasta has agreed to fund US $10,000,000.in exploration work on areas of the Asmara Project and has become the Company's largest shareholder through a US $5.0 million private placement.
Management: Sunridge is managed by an experienced team with a successful track record of discovery and development of precious and base metals projects with companies such as Bema Gold and Nevsun Resources.
"
We have not seen these kind of Copper grades for a while from our time with Tenke Mining in Congo. Results are very encouraging and stock is trading still on fears about UN sanctions. Nevsun Resources proceeds with its project and now is fully financed - it will be the catalyst to Sunridge Gold reavaluation. Here we have an another example of political risk vs technical one.
Thu Feb 25, 2010
Sunridge Gold Corp. (SGC/TSX.V) is pleased to report that results from the recently completed thirty-five drill holes at the 100% Sunridge owned Debarwa copper-gold-zinc volcanogenic massive sulphide (VMS) project has expanded the envelope of mineralization both down dip and along strike to the south. Additionally, a new eastern limb to the Debarwa deposit has been discovered and the drilling has demonstrated that the Debarwa deposit remains open in several areas. Debarwa Highlights:
Results from drill holes DEBD-092, DEBD-095 and DEBD-113 show the high-grade copper supergene intercept to be significantly wider than predicted and drill hole DEBD-095 extended this zone about 20 metres further down-dip.
Drill holes DEBD-093, DEBD-094 and DEBD-121 successfully intercepted high-grade copper supergene mineralization in the Debarwa South zone located approximately 400 metres south of the main Debarwa zone.
Drill holes DEBD-098 and DEBD-103 intercepted a previously unknown limb located 100 to 200 metres to the east of the main Debarwa deposit.
Drill holes DEBD-100, 108, 110, 111, 112, 118, and 119 expanded the primary mineralization to depth which remains open to depth.
Drill holes DEBD-122 and DEBD-123 extended the strike length of the Debarwa deposit by approximately 200 metres beyond any previous drilling to the south and the zone remains open to the south. See map at the end of this document. Debarwa Assay Highlights:
DEBD-092: 36.75 metres grading 4.82% copper and 1.12 g/t gold, including 15.67 metres grading 10.21% copper and 2.01 g/t gold
DEBD-093: 24.00 metres grading 1.13% copper
DEBD-094: 26.15 metres grading 3.77% copper including 14.15 metres grading 6.26% copper
DEBD-095: 7.62 metres grading 4.62% copper
DEBD-111: 4 metres grading 1.09% copper, 9.33% zinc and 2.72 g/t gold
DEBD-112: 11.16 metres grading 1.15% copper, 2.82% zinc and 2.48 g/t gold.
DEBD-113: 6.7 metres grading 13.42% copper, 2.63 g/t gold, and 49.21 g/t silver.
DEBD-114: 9.40 metres grading 2.11% copper, 1.91 g/t gold, and 142.77 g/t silver.
DEBD-121: 7.50 metres grading 3.33% copper.
Michael Hopley, President and CEO of Sunridge comments that "The drilling results from Debarwa are very encouraging and they will undoubtedly increase the existing resources which should have a very positive influence on the scoping study that we plan to start next month".
In the existing resource at Debarwa the copper supergene zone has an average grade of 5.36% copper using a 1% copper cut-off, and is estimated to contain 158 million pounds of copper in the Indicated category. The primary zone at Debarwa has not had significant delineation drilling in previous programs and is open for expansion at depth and along strike. The primary zone has an average grade of 2.53% copper with 3.23% zinc in the Indicated category using a 1% copper cut-off. (see the resource statement below).
DAERO PAULUS UPDATE:The drill program at Daero Paulus copper target funded by Antofagasta Minerals S.A. is continuing and the current phase is expected to be completed in a few weeks. To date, approximately 2,000 metres in 6 drill holes have been completed and results are expected in 6 weeks.
NOTES:
A Quality Assurance/Quality Control program was part of the drilling program on the Debarwa deposit. This program includes chain of custody protocols as well as systematic submittals of standards, duplicates and blank samples into the flow of samples produced by the drilling.
Samples from the drilling were prepared at African Horn Testing Services (Eritrea) and analyzed at Genalysis Laboratories (a NATA registered laboratory) in Perth, Western Australia and also at ALS Chemex Laboratories in Romania.
True thickness is estimated at approximately 90% of the drill intervals reported in the table above.
The assay results from the Debarwa drilling have been reviewed by Michael J. Hopley the Qualified Person for Sunridge. Mr. Hopley is also the person responsible for preparation of the technical information contained in this news release and is President and Chief Executive Officer of Sunridge.
ABOUT SUNRIDGE:
Sunridge is a mineral exploration and development company focused on the acquisition, exploration, discovery and development of base and precious metal projects on the Asmara Project in Eritrea and exploration properties in Madagascar. Sunridge has approximately 76 million shares outstanding and approximately $6.5 million in cash. Sunridge trades on the TSX Venture Exchange under the symbol SGC. For additional information on the Company and its projects please view the slide show on our website at www.sunridgegold.com or call Don Halliday or Greg Davis at the numbers listed below.SUNRIDGE GOLD CORP."Michael Hopley" Michael Hopley, President and Chief Executive Officer

Thursday, February 4, 2010


"We have mentioned before about Gold Sell signal and suggested that there will be a time to accumulate Juniors, which will provide more upside opportunities with another Leg Up in the gold market."







It is a very encouraging news for Eritrea - after UN sanctions all Juniors involved in the counter were under pressure. In a long perspective it will be very positive development for Sunridge Gold SGC.v and new parent company of former Sanu Resources SNU.v - Lukas Lunding global exploration play NGeX Resources NGQ.to which is now trading below recent financing, when Lukas Lundin has increased his holding in the company.



February 04, 2010

VANCOUVER, BRITISH COLUMBIA -- Nevsun Resources Ltd. (TSX:NSU)(NYSE Amex:NSU) -
Highlights
$117 MILLION PRIVATE PLACEMENT (US$110 MILLION)
BISHA FINANCE OVERHANG REMOVED
Nevsun Resources Ltd. ("Nevsun") is pleased to advise that it has arranged a non-brokered private placement financing of 52,000,000 common shares at Cdn $2.25 per share for Cdn$117 million (US$110 million). The private placement is scheduled to close on or before February 19, 2010 and is subject to certain conditions, including the receipt of all necessary regulatory approvals. The net proceeds from the offering will be used for Bisha mine development and general working capital purposes.
The Company is confident the funds from this private placement, together with its existing cash and the ongoing one-third contribution by the State of Eritrea to Bisha will be sufficient to see the Bisha project through to cash positive operations. The funding arrangements are in excess of estimated costs to complete so as to provide a reasonable cushion in the event of unforeseen events.The Eritrean National Mining Corporation (ENAMCO) has reliably provided its one-third contributing share of financing to Bisha as the project has progressed. In addition the State continues to provide overall support for a responsible mining industry that is in the early stages of development within the country.
The change in approach to the funding of the Bisha project is to ensure the project continues on schedule. While Bisha had already completed project debt agreements with European and South African lenders, these debt facilities have not yet been drawn because the European lenders required the German government's support via its UFK scheme (effectively a partial guarantee to European lenders). The Company regrets that the European lenders and German government have been unable to follow through within our time requirements. The South African lender recently reconfirmed the availability of project debt (refer to Nevsun news release dated January 14, 2010) however it became apparent very recently that access to the debt in our time frame was uncertain. The Company and ENAMCO have concluded that the debt facilities are sufficiently unreliable and inconclusive for our project.
The Company has taken a prudent business approach to secure funding needed to complete the Bisha project on schedule and has no practical alternative but to proceed without the debt providers. While the Company would have preferred to stay with a leveraged project, the higher priority is to get the project built and producing cash. Due to the very robust nature of the project and assuming recent metals prices, the payback to the Company is now expected to be under one year.
As advised in news releases during January, the project is very well advanced (approaching 50% complete) and costs are re-estimated to be approximately $260 million, close to the original budget of approximately $250 million.
The securities being offered in the non-brokered private placement have not been, nor will they be, registered under the United States Securities Act of 1933, as amended, (the "U.S. Securities Act"), and such securities may not be offered or sold within the United States or to, or for the account or benefit of, U.S. persons absent registration under the U.S. Securities Act or an exemption therefrom. This release does not constitute an offer to sell or a solicitation of an offer to buy the securities in the United States.
Forward Looking Statements: Forward Looking Statements: The above contains forward looking statements that are subject to a number of known and unknown risks, uncertainties and other factors that may cause actual results to differ materially from those anticipated in our forward looking statements. Factors that could cause such differences include: the closing date of the announced private placement, the total value of the private placement, the adequacy of funding for development of the Bisha project and the continuing availability of funding from the State of Eritrea. Forward-looking statements in this release include statements regarding future dates, plans for proceeds, expected costs to complete, percentage of completion and pay-back period using recent metals prices. Although we believe the expectations reflected in our forward looking statements are reasonable, results may vary, and we cannot guarantee future results, levels of activity, performance or achievements.
NEVSUN RESOURCES LTD.Cliff T. DavisPresident & Chief Executive Officer"

Wednesday, January 20, 2010


"Lukas Lundin looks like missing from our Lithium and REE fever: we can hardly call it an "exposure" via his holdings in Canada Zinc Metals CZX.v after investing in TNR Gold TNR.v"
"We expect Lukas Lundin to storm the junior space back with his troops. He was out of the picture for a while and put his exploration ambitions on hold consolidating Canadian Gold Hunters CGH.to, Suramina Resources and Sanu Resources. He has grown up fast first in size of the controlled assets and status of Major League by Lundin Mining and then was hit with problems followed - he was busy saving them after the crash. But now we have a few signs of his team coming back into the junior M&A market space and we would like to speculate whether it could lead to any catalyst in juniors we are following."



With this Global Exploration vehicle of Lukas Lundin group it is easier to tell where they do not have projects than where they have. NGEx Resources presented in South and North Americas and in Africa.
In Argentina Company has a few J/V deals and properties with TNR Gold TNR.v. Results from Jose Maria will be important for Batidero property under option from TNR Gold.
NGEx has recently raised capital and the most important news is that Lukas Lundin has increased his position in the company via his family investment vehicle Zebra Holdings. We are always following smart money and companies where insiders are holding a significant stake and are increasing their positions.

"TNR Gold investor acquires five million more units
2009-12-23 18:44 ET - News Release
Mr. Kirill Klip reports
TNR EARLY WARNING REPORT
Kirill Klip has acquired through a private placement, directly or indirectly, five million units at a price of 30 cents per unit of TNR Gold Corp. Each unit consists of one common share and one-half common share purchase warrant. Each whole warrant entitles Mr. Klip to purchase an additional common share at a price of 40 cents, up to and including Dec. 17, 2011. The common shares of TNR are listed on the TSX Venture Exchange. Assuming full exercise of the warrants, Mr. Klip would hold a 22.46-per-cent interest in TNR.
As stated in Stockwatch on Feb 25, 2009, Mr. Klip owned, or exercised control or direction over, an aggregate of 14,250,500 common shares, 975,000 warrants and 950,000 stock options, and a $150,000 principal amount debenture and associated warrants. Assuming conversion of the $150,000 principal amount debenture and exercise of the associated warrants, together with Mr. Klip's warrants and stock options, TNR had 85,486,983 common shares outstanding of which Mr. Klip would exercise control or direction of a 25.94-per-cent interest."


Now with recent news in Lithium sector Argentina promise the hot Summer in that part of the world, but do not discount solid Gold and Copper and we are looking for the results from announced exploration programs.

NGEx investor Zebra buys five million more shares
2009-12-23 19:39 ET - News Release
Mr. Aksel Azrac of Zebra Holdings reports
ZEBRA HOLDINGS & INVESTMENTS S.A.R.L.: CORPORATE UPDATE-NGEX RESOURCES INC.
Zebra Holdings and Investments SARL, on Dec. 21, 2009, purchased three million common shares of NGEx Resources Inc. at a price of 70 cents per share, through the facilities of the TSX Venture Exchange and purchased two million shares of the company pursuant to a private transaction. Prior to the purchase of the shares, the offeror owned 10,411,841 common shares and an investment company acting jointly with the offeror owned 5,615,400 common shares of the company, representing approximately 10.91 per cent of the company's issued and outstanding share capital. The offeror and the joint actor now own and have control over a total of 21,027,241 common shares of the company, or approximately 14.32 per cent of the issued and outstanding shares of the company. The offeror relied upon the accredited investor exemption provided for in Section 2.3 of National Instrument 45-106 in connection with the issuance of two million of the five million common shares."






NGEx Announces Updates on South American and Eritrean Drill Programs


Press Release Source: NGEx Resources Inc. On Tuesday January 19, 2010, 3:35 pm EST

VANCOUVER, BRITISH COLUMBIA--(Marketwire - Jan. 19, 2010) - NGEx Resources Inc. (TSX:NGQ - News; 'NGEx' or the 'Company') is pleased to report on its drill programs currently underway in Chile and Eritrea. The Company's 2010 drill program at its Los Helados project located in Region III, Chile started on January 14, 2010 at site I (to see photo please click on: http://us.lrd.yahoo.com/_ylt=AswKZuVE5V_pYRj3k5PxmUqtcq9_;_ylu=X3oDMTE2YTJoZXNrBHBvcwMzBHNlYwNuZXdzYXJzdGFydARzbGsDaHR0cG1lZGlhM21h/SIG=11ipio592/**http%3A//media3.marketwire.com/docs/ngq119a.jpg). The planned program will consist of approximately 3,800 meters in 6 or 7 holes. Drilling is planned to follow up on encouraging results obtained in DDH 04 drilled in 2009 which intersected 762 meters of 0.43% copper and 0.22 g/t gold, including 343 meters of 0.58% copper and 0.21 g/t gold. The drilling will target a 1 kilometre long chargeability anomaly that lies to the north of previous drilling. Outcrops above the anomaly contain potassic alteration, stockwork veining and local copper sulphides. The drill program is expected to take approximately two months. Los Helados is part of the Company's joint venture with the Japan Oil, Gas and Metals National Corporation (JOGMEC). JOGMEC holds a 40% participating interest in Los Helados.
Drilling at the Company's nearby Josemaria project concluded in mid-December, 2009. Seven diamond drill holes totalling 2,253 meters tested possible extensions of the Josemaria resource. Results are expected toward the end of January, 2010.
The Company also has a drill program underway in western Eritrea that is targeting volcanogenic massive sulphide targets on its Mogoraib and Kerkebeit licenses. Drilling will test additional targets at the Koken Prospect where initial drilling in 2008 intersected encouraging results; possible extensions to the Hambok deposit identified by a gradient IP survey conducted in November, 2009 (to see map please click on: http://us.lrd.yahoo.com/_ylt=ApC35xY5MGLkxqdeh1rIoUGtcq9_;_ylu=X3oDMTE2OWh2ZWsxBHBvcwMxBHNlYwNuZXdzYXJ0Ym9keQRzbGsDaHR0cG1lZGlhM21h/SIG=11idv5u0k/**http%3A//media3.marketwire.com/docs/ngq119b.jpg).
Drilling is also underway to test a new mineralized gossan known as the Aradaib prospect that was identified by prospecting (to see photo please click on: http://us.lrd.yahoo.com/_ylt=Ai1af2wHCCu6h2wvpT.s5watcq9_;_ylu=X3oDMTE2M2xsajZuBHBvcwMyBHNlYwNuZXdzYXJ0Ym9keQRzbGsDaHR0cG1lZGlhM21h/SIG=11idniojr/**http%3A//media3.marketwire.com/docs/ngq119c.jpg). Initial work identified 350m of discontinuous strike exposure of the gossan. Of twelve rock chip samples taken, ten returned anomalous gold values (100 to 350ppb) with two assaying 4.1 and 8.9gpt, five had Cu values greater than 1000ppm, and two had Pb greater than 1000ppm. Zn is moderately anomalous in all of them.
Aradaib Gossan
Dr. Wojtek Wodzicki, P. Geo. (BC), President and CEO of NGEx, a Qualified Person as defined by National Instrument 43-101, has review the technical contents of this release.
On behalf of the Board,
Dr. Wojtek Wodzicki, President and CEO"

Wednesday, December 16, 2009





Volta Resources is up today 85% on its confirmation of wide gold mineralisation at Kiaka Gold project.
Press Release Source: Volta Resources Inc. On Wednesday December 16, 2009, 9:52 am EST
-Volta intersects 136m (at) 1.66g/t on the KMZ Zone at Kiaka-
TSX: VTRTORONTO, Dec. 16 /CNW/ - Volta Resources Inc. ("Volta" or the "Company") (TSX: VTR - News) announces the results from the first 3 holes completed on it's Kiaka Gold Project, located approximately 120 kilometres southeast of Ouagadougou, the capital city of Burkina Faso. Volta acquired the property from Randgold Resources, with the transaction being approved by shareholders on November 13th, 2009. The company commenced an aggressive drilling program comprising more than 150 holes for over 22,000 metres on November 22nd, 2009 (see Figure 1 - http://us.lrd.yahoo.com/_ylt=AqxLv09KWSJHKLmcgo7Vp9.vcq9_;_ylu=X3oDMTE2bGlvMTc4BHBvcwMzBHNlYwNuZXdzYXJzdGFydARzbGsDaHR0cGZpbGVzbmV3/SIG=11l9122k3/**http%3A//files.newswire.ca/407/Volta_Resources.pdf). Volta intends to complete the program by the end of April 2010 and to finalize a National Instrument 43-101 ("NI43-101") compliant resource before the end of June 2010. To date, 9 holes have been completed.
The results for the first 3 holes drilled on Section 5250N have already been received from ALS Chemex Laboratories in Ouagadougou. The highlights include:
Kevin Bullock, Volta's President and CEO, said, "These first impressively wide intersections clearly support Kiaka's historical potential outlined by Randgold. More importantly, they bode well for Volta's decision to aggressively focus on Kiaka as its premier development project."
Vic King, Volta's COO, said, "The results from Volta's infill drillholes confirm the impressive width of the KMZ zone, previously defined by Randgold on the same section in holes KDH05 and KDH14. More importantly, Volta's closer drill spacing has better defined the continuity on the section of discrete higher grade zones. These were initially observed during Volta's due diligence review of the project. Our logging has confirmed that the higher grade zones can be broadly correlated with brittle-ductile deformation, a strong secondary structural fabric and a distinct alteration assemblage. These relationships will facilitate confidently tracking these higher grade zones from section to section, thereby improving geological modeling and resource estimation, with positive implications for improving overall project economics."
Volta's current drill program will test 1,200m strike of the 2,800m long KMZ zone and 500m of the 700m long KHZ zone. The program will infill and extend drilling such that the KMZ zone is drilled to 50m x 50m spacing from surface to a 150m depth and 100m x 50m from 150m to 200m depth. On the narrower KHZ zone, drill spacing will be 50m x 50m from surface to a 100m depth and 100m x 50m from 100m to 150m. Planning and optimization of the drill program was undertaken with input from SRK Consulting (UK) to ensure that the delivery of the independent resource consultant's NI 43-101 compliant resource is delivered as efficiently as possible.
In order to appreciate the extent and geometry of the mineralization on the 5250N section, the results for the three Volta holes and two of Randgold's holes are highlighted in the Table1 below and on the section (see Figure 2 - http://files.newswire.ca/407/Volta_Resources.pdf). Analyses of the Volta samples were undertaken by fire assay on a 50g charge at ALS Chemex Laboratories in Ouagadougou. Both Volta and Randgold sampling and assay procedures included QA/QC elements that employed the inclusion of certified standards and blanks.
The intersections listed in the Table 1 below are based on a 0.3 g/t gold cut-off with maximum internal dilution of 5m for the lower grade mineralization envelope. In order to highlight the continuity of the high grade zone, a 0.8 g/t gold cut-off with maximum internal dilution of 2m has been used. Details of the drilling are provided in

Saturday, December 5, 2009


We have not seen such grades for a while and think that Sunridge Gold SGC.v has finally get its footing after the recent collapse in Juniors. They manage to attract Antofagasta and now can advance their projects more rapidly, this kind of grades will bring attention. Peter Grandich was pushing the company on PR side from as low as 0.2CAD this April with his options priced at 0.15CAD, timing was right: just before Copper picked up and Antofagasta stepped in. He managed to crash share price recently just before this news were announced with a legitimate concern about security in Eritrea in his email blast. Cynical people could think that it is not a news at all, but we will not go there. Somebody liked the news and loaded up, we will monitor the development. For us it is "Big IF in action again" - What if the size of the deposit and its grade will overcome security concerns for the Eritrea and Africa will be on a radar screens again? Nevsun Resources NSU.to ongoing development will generate the news and keep investors alert to the area.




We were not writing about Gold Juniors for a while and will address the Big Picture in Gold later, nothing have changed for us. We are going to have bumps like this Friday after parabolic rise. Everybody is writing about Gold and Majors now and we save our time and energy moving into the new Bull markets at their very beginning. Gold will preserve the wealth and gold Juniors will be next year investment theme in gold again. This pull back will allow to accumulate names you were waiting for and rotate out of majors. We have been rotating out of Junior "Majors" recently known to everybody and accumulating new ideas. We are on the same page with Rob McEwen and following him: The next big play in gold will be in Juniors.





Press Release
Source: Sunridge Gold Corp.
On 8:00 am EST, Wednesday December 2, 2009
Companies:
Sunridge Gold Corp. (Tier2)
VANCOUVER, BRITISH COLUMBIA--(Marketwire - 12/02/09) - Sunridge Gold Corp. (TSX-V:SGC - News) is pleased to announce assay results for the first four diamond drill holes from the 2009 drill program at the 100% owned Debarwa high-grade copper-gold-zinc volcanogenic massive sulphide (VMS) deposit in Eritrea. To date, thirty-five holes have been completed with the objective of expanding the supergene and primary zones. Further assays will be released as available.
DRILL HIGHLIGHTS:
DEBD-092: 36.75 metres grading 4.82% copper and 1.12 g/t gold, including 15.67 metres grading 10.21% copper and 2.01 g/t gold
DEBD-093: 24.00 metres grading 1.13% copper
DEBD-094: 26.15 metres grading 3.77% copper including 14.15 metres grading 6.26% copper
Holes DEBD-092 and 095 were drilled into the main copper supergene zone at Debarwa to further define this zone and to get fresh samples for further metallurgical testing. Results of DEBD-092 are very encouraging because the high grade copper supergene intercept in this hole is significantly wider than predicted. In addition, drill hole DEBD-095 extended the high grade supergene copper zone about 20 metres further down-dip.
Drill holes DEBD-093 and DEBD-094 were drilled to define and extend the high-grade copper mineralization down-dip in the Debarwa South and successfully intercepted the high-grade zone. The Debarwa south zone is located approximately 400 metres south of the main Debarwa zone. DEBD-092 and 094 both indicate potential to increase resources and grades at the Debarwa VMS deposit (see attached map:
http://media3.marketwire.com/docs/sgc121.pdf).



The objective of the drill program at Debarwa is to expand the existing resources by testing nearby geophysical anomalies as well as attempting to extend the high-grade copper-gold supergene zone to the south and to extend the copper-zinc primary zone to depth. In addition, fresh samples for metallurgical testwork were recovered.
In the existing resource at Debarwa the copper supergene zone has an average grade of 5.36% copper using a 1% copper cut-off, and is estimated to contain 158 million pounds of copper in the Indicated category. The primary zone at Debarwa has not had significant delineation drilling in previous programs and is open for expansion at depth and along strike. The primary zone has an average grade of 2.53% copper with 3.23% zinc in the Indicated category using a 1% copper cut-off (see the resource statement below).
Michael J. Hopley is the Qualified Person for Sunridge and is the person responsible for preparation of the technical information contained in this news release. Mr. Hopley is President and Chief Executive Officer of Sunridge.
ABOUT SUNRIDGE:
Sunridge Gold Corp. is a mineral exploration and development company focused on the acquisition, exploration, discovery and development of base and precious metal projects on the Asmara Project in Eritrea. On October 2, 2009, Sunridge announced the signing of a definitive exploration and funding agreement with Antofagasta Minerals S.A. to form a strategic partnership whereby Antofagasta will fund US$10,000,000 of exploration work over a five year period on the "Exploration Areas" of the Asmara project to earn up to a 75% interest in these areas and also invested US$5,000,000 in a non-brokered private placement.
Sunridge has approximately 76 million shares outstanding and $8.3 million in cash. Sunridge trades on the TSX Venture Exchange under the symbol SGC. For additional information on the Company and its projects please view the slide show on our website at http://us.lrd.yahoo.com/_ylt=AgBUzAh7Qv6Db9mNL99rhpmtcq9_;_ylu=X3oDMTE2aGRwcmY3BHBvcwMyBHNlYwNuZXdzQXJ0Qm9keQRzbGsDd3d3c3VucmlkZ2Vn/SIG=111j5di32/**http%3A//www.sunridgegold.com/ or call Don Halliday or Greg Davis at the numbers listed below.
SUNRIDGE GOLD CORP.
Michael Hopley, President and Chief Executive Officer"

Wednesday, August 26, 2009

Something is baking on. Is it an M&A?



"Posted by Peter Grandich at 12:49 PM on Tuesday, August 25th, 2009 Lots of inquiries about action today in Nevsun Resources. As you know this is a prime takeover candidate IMHO. The shares pulled back recently during the consolidation in gold and the umpteen no, new-news story of America’s political view on Eritrea. I had hoped this way overblown concern and gold weakness could bring Christmas early by allowing purchases at $1.40 or under U.S. We almost got our present.
Whether today’s latest rumor of takeover amounts to anything or not, I do believe barring a collapse in metal prices and/or a dramatic escalation of the friction involving Eritrea, a takeover of NSU is not if, but when. This is a superb project with a fantastic payback schedule.
If and when such a deal takes place, I suspect Eritrea can become a major area play given the tremendous exploration potential it has. Sunridge Gold (SGC-TSX.V $.40) is a natural “next-in-line” play with a strong package of projects. My belief, albeit prejudice due to the working relationship I have with SGC, is SGC becomes the next institutional/mining company darling in the area.
Stay tuned."

Thursday, July 2, 2009


Follow the money: we always add - Smart Money. Lukas Lundin is building his global Exploration Play. We have our Junior Mining Economics in action. We have wrote before about our expectations of Sanu Resources SNU.v to be taken out by Canadian Gold Hunters CGH.to - our list of Juniors Top Picks 2009 is getting smaller! It is time to buy assets at still distressed valuations, later with Gold over 1000 USD/oz, Silver above 15 USD/oz and Copper solidly above USD 2.0/lb will be the time to strike J/V deals and sell in the Seller's market, when everybody will be thinking: how on earth we can get this kind of valuations before. But it is the future and it is not for certain - that is why Lukas Lundin is buying again at cents per dollar in our second chance of Junior Mining Investment cycle. We follow his touch and legacy. Our other juniors from the Top Picks 2009 are in the game with bold moves into Gold, Lithium and REE.


Lukas H. Lundin
"Chairman
Born in 1958, Lukas Lundin was raised in Stockholm, Sweden and educated at the Ecole Internationale de Genève in Switzerland. In 1981, Mr. Lundin graduated from the New Mexico Institute of Mining and Technology (engineering).At age 25 Mr. Lundin headed International Petroleum Corporation's extensive and rapidly growing international operations and was based in the Company's technical office in Dubai, U.A.E. for over 12 years. From 1990 to June 1995, Mr. Lundin was President of International Musto Exploration Limited and was responsible for Musto's acquisition of the Bajo de la Alumbrera deposit. Bajo de la Alumbrera was the subject of a $500 million takeover by Rio Algom and North Limited and is now one of the largest gold/copper producers in the world. Mr. Lundin was also responsible for Argentina Gold and the discovery of the multi-million ounce Veladero gold deposit. Veladero was the subject of a $300 million takeover by Homestake in 1999. In addition, Mr. Lundin was a senior Director of Lundin Oil AB and was instrumental in the $480 million takeover of Lundin Oil by Talisman Energy in 2001. Mr. Lundin is currently a Director of a number of publicly traded resource companies. Mr. Lundin has been a director of Canadian Gold Hunter since June 1995.A world traveler and motorcycle racing enthusiast, Mr. Lundin has twice completed the grueling 10,000 kilometre Dakar race across the Sahara Desert. He has climbed Mount Kilimanjaro, Mont Blanc and the Matterhorn. In the winter, he can be found helicopter skiing in Whistler and in summer, dirt bike racing with his four boys in Baja, California and has been a director of Canadian Gold Hunter since June 1995 and is now Chairman of the Board
."






* Sanu shares up 21 percent


July 2 (Reuters) - Gold miner Canadian Gold Hunter Corp (CGH.TO) said it agreed to acquire Sanu Resources Ltd (SNU.V) in an all-stock deal to expand its gold and base metal exploration and production activities to Africa.
Canadian Gold Hunter said it will issue 0.5725 of its shares for each Sanu share. Based on Canadian Gold Hunter's prior closing price of 36.5 Canadian cents, the deal values Sanu at about 21 Canadian cents a share, a premium of 27 percent to its previous close.
Shares of Sanu rose 21 percent to 20 Canadian cents Thursday morning on the Toronto Venture Exchange. Canadian Gold Hunter shares were down 4 percent on the Toronto Stock Exchange.
Sanu will be a wholly owned subsidiary of Canadian Gold Hunter after the deal closes, which is expected to occur by the end of August.
Former shareholders of Sanu will hold about 17.8 percent of Canadian Gold Hunter following the deal.
Canadian Gold Hunter, which has projects in Canada, Mexico and South America, said Sanu has projects in African nations like Eritrea, Republic of Congo and Burkina Faso.
For the alerts, please double click [ID:nWNAB4038] (Reporting by Arup Roychoudhury in Bangalore; Editing by Deepak Kannan)"




Press Release
Source: Canadian Gold Hunter Corp., Sanu Resources Ltd.
On Thursday July 2, 2009, 8:48 am EDT


VANCOUVER, BRITISH COLUMBIA--(Marketwire - July 2, 2009) - Canadian Gold Hunter Corp. (TSX:CGH - News; "Canadian Gold Hunter") and Sanu Resources Ltd. (TSX VENTURE:SNU - News; "Sanu") are pleased to announce that they have entered into a definitive agreement (the "Arrangement Agreement") to effect a business combination between the two companies pursuant to a plan of arrangement under the Canada Business Corporations Act.
Pursuant to the Arrangement Agreement, Canadian Gold Hunter will acquire all of the issued and outstanding shares of Sanu on the basis of 0.5725 shares of Canadian Gold Hunter for each one Sanu share (the "Exchange Ratio"). All outstanding Sanu options will be exchanged for replacement options of Canadian Gold Hunter, the number and exercise price of which will be determined using the Exchange Ratio. The transaction values the Sanu shares at $0.233 per share, representing a 25% premium to the 20 day volume weighted average closing price of Sanu. Upon completion of the transaction, Sanu will be a wholly-owned subsidiary of Canadian Gold Hunter and it is estimated that Canadian Gold Hunter will have 134,161,066 shares outstanding. Former shareholders of Sanu will hold approximately 17.8% of the outstanding shares of Canadian Gold Hunter. The transaction is expected to close by the end of August, 2009.
Full details of the transaction, including the terms of the Arrangement Agreement, will be included in a management information circular which is expected to be mailed to shareholders of Sanu on or about July 22, 2009. Sanu plans to hold a special meeting of shareholders to approve the transaction and related matters on or about August 17, 2009. The transaction is subject to all requisite regulatory and court approvals as well as shareholder approval of the transaction by at least 66 2/3% of the votes cast by Sanu shareholders present in person or represented by proxy at the meeting.
The transaction has been approved by the board of directors of Sanu (with interested directors abstaining) following the unanimous recommendation of a special committee comprising Sanu's independent directors. The board of directors of Sanu recommends that their shareholders vote in favour of the transaction.
Benefits of the Business Combination
- Sanu brings to the transaction a strong portfolio of gold and base metal exploration projects in Africa. Sanu's most advanced project is the Hambok deposit in Eritrea with an NI 43-101 indicated resource (at a 0.75% zinc cutoff) of 10.7 million tonnes grading 0.98% copper, 2.25% zinc, 6.84 g/t silver, 0.20 g/t gold containing 231.1 million pounds of copper, 530.7 million pound of zinc, 2.3 million ounces of sliver, 68.8 thousand ounces of gold. There is an additional inferred resource (at a 0.75% zinc cutoff) of 17.0 million tonnes of 0.85% copper, 1.74% zinc, 5.89 g/t silver, 0.19 g/t gold containing, 318.5 million pounds of copper, 652.1 million pounds of zinc, 3.2 million ounces of sliver, and 103.8 thousand ounces of gold. Please see the NI 43-101 Technical Report on the Hambok Deposit, dated January 23, 2009 and filed at www.sedar.com for details. Hambok is located 15 kilometres from the Bisha deposit being developed by Nevsun Resources and the Eritrean Government. Additional projects include carbonate-hosted copper/lead/zinc exploration in the Republic of Congo; greenstone-hosted gold exploration in Burkina Faso; as well as volcanogenic massive sulphide copper/zinc exploration in Eritrea.
- Canadian Gold Hunter holds a large, diversified portfolio of exploration projects in Canada, Mexico, Argentina, Chile, Colombia and Peru. Projects range from grass roots to advanced resource definition stage, including the Josemaria copper/gold porphyry project with a 43-101 inferred resource of 460 million tonnes grading 0.39% copper and 0.30 g/t gold at a 0.3% TCu cut-off, containing 3.9 billion pounds of copper and 4.4 million ounces of gold. (Please see news release dated December 5, 2007 for complete information). Canadian Gold Hunter's local South American exploration team has a strong track record of success including the discovery of the Veladero gold deposit, now owned by Barrick Gold, as well as the initial recognition and development of the Bajo de la Alumbrera gold mine, now owned by Gold Corp., Xstrata and Yamana.
- Combining the two companies will create one of the strongest exploration vehicles in the industry; worldwide exploration with the backing of the Lundin Group.
In connection with the proposed business combination, Dundee Securities Corporation provided financial advice and a fairness opinion to the special committee of the board of directors of Sanu.
ON BEHALF OF THE BOARD OF CANADIAN GOLD HUNTER
Lukas H. Lundin, Chairman
ON BEHALF OF THE BOARD OF SANU RESOURCES LTD.
Paul Conibear, Chairman"

Tuesday, June 30, 2009

One more forgotten junior is coming out from misery: Volta Resources VTR.to could be a good accumulation idea for summer before gold crossed 1000 USD/oz with all recent developments in the company.
Tuesday, June 30, 2009

Volta Resources intersects 41 Metres @ 3.23 Grams per tonne of Gold at its Kampti Gold Project.
It is always interesting to see companies engaged in the development of gold assets in West Africa and the progress they make. Unlike Central African countries West Africa has stable political environments, offers mining friendly regulatory framework and have world class deposits.
West Africa is the home for several well known mining companies such as AngloGoldAshanti (NYSE: AU), Newmont Mining (NYSE: NEM) and Randgold Resources Ltd (NASDAQ: GOLD). It is against this backdrop that we continue to follow Canadian Venture listed Volta Resources Inc. (TSX: VTR). Volta Resources is actively exploring 4,125 square kilometres of highly prospective greenstone belt in 20 properties in both Burkina Faso and Ghana. The properties are generally located on the margins of mature to emerging gold belts, the geological setting for numerous world-class gold mines in the region. VTR has continued its development endeavours in its prospect portfolio.The company’s current focus however is Kampti III and Gaoua properties both in Burkina Faso. Results from its recently completed reverse circulation ("RC") drilling program on the Maména-Fofora prospect at its 100% owned Kampti III property include intersections of 41m @ 3.23g/t gold ("Au"), 5m @ 6.84g/t Au, 6m @ 4.28g/t Au, 8m @ 4.15g/t Au and 5m @ 2.06g/t Au. Drilling confirms the presence of gold mineralization in all three target areas, with most holes intersecting anomalous gold values (>0.25g/t Au) over multiple zones. The Kampti property is located in southernmost Burkina Faso, close to the border with Ivory Coast. The project consists of one single permit (Kampti III), covering about 250km² and wholly-owned by Volta Resources. The project is characterized by a 22km-long and 4km-wide corridor, defined by several geochemical (BLEG and soil) anomalies and by geological mapping, trending NNW through the centre of the entire permit.According to Kevin Bullock, President and CEO, results have exceed their expectations and the company will follow up with more drilling that will further define the growing potential at Kampti. The next step is to undertake another auger drilling programme to infill, refine and further extend the Kampti targets in order to prepare for the next round of RC and diamond drilling. VTR is well financed and is in a position to undertake its development endeavours. Kevin Bullock intends to spend $1 million at Kampti and Gaoua properties over the next six months to December. The company has approximately $6 million in the treasury. We have brought VTR progress to our readers’ notice and will continue to follow the company.
About Volta Resources
Volta Resources was formed through a 50/50 merger of two experienced West African explorers, Birim Goldfields Inc. and Goldcrest Resources Ltd and has a portfolio of properties in Ghana and Burkina Faso. Volta's primary focus is to become the leader in the identification, acquisition and exploration of gold properties in West Africa."


 

blogger templates | Make Money Online